On Monday, NASA failed in its first attempt to launch the uncrewed Artemis 1 mission, with engineers struggling to resolve an engine cooling issue. It’s a wholly unsurprising result, given that NASA was unable to complete a single wet dress rehearsal, of which four were attempted earlier in the year. The space agency appears to be winging it, with the botched launch attempt effectively serving as the fifth wet dress rehearsal, in what is a troubling sign.
Artemis launch: NASA rocket leaks liquid hydrogen fuel ahead of second attempt In other news NASA has a RFQ out for a pallet of duct tape and maybe some JB Ironweld.
NASA's star-crossed Space Launch System moon rocket was grounded Saturday for the second time in five days after engineers tried and failed to remotely stop a hydrogen leak in a quick-disconnect fitting where propellants are fed into the giant booster's first stage. Engineers made three attempts to properly "seat" a suspect seal in the 8-inch fitting, but none of them worked and after a "no-go" recommendation from the engineers working the problem, Launch Director Charlie Blackwell-Thompson called off the countdown at 11:17 a.m. EDT. 6th Wet dress rehearsal - and another FAIL. Waiting for the next try or a big RUD.